Construction Technology 2 is the continuing subject of Construction Technology 1. In CT2, the topics covered include basement temporary support system, piled foundation, scaffolding, trench shoring system, underpinning, partition wall, suspended ceiling, portal frame, precast concrete and steel frame building.
The assignment for CT2 required us to conduct site visit to the construction site and produce a case study report which is related to one of the topic learnt in CT2. Hence, we had conducted site visit to two construction site, i-SOHO and D'Latour which located at i-City, Shah Alam and next to Taylor's University repectively.
|
i-SOHO project |
|
D'Latour project |
We do learnt alot by having site visit to the construction site as the project manager and engineers are nice and willing to share with us the on site practice at construction site. Besides, they also shared some experiences and problems we may faced when we work in the construction industry in the future.
|
Casing that will be driven into the subsoil |
|
Boring of subsoil |
|
Reinforcement used in bored piled foundation |
|
Load test for pile |
|
PDA test for the pile
|
|
Concreting |
|
Pile with starter bars |
|
Pile cap with timber formwork |
|
Unconcreted pile cap with stump reinforcement |
|
Dewatering pump |
|
Group photo of site visit to D'Latour with the project manager, Mr. Shahbuddin |
|
Group photo of site visit to D'Latour with the residential engineer Mr. Chan
|